The foundations for API 650 uplifting tanks

Soil Structure Interaction: Soil structure interaction per API 650, Section E.6.1.6 may be used for OLE design providing the damping ratio does not exceed 10 %.
Allowable Stresses
Design allowable stresses shall be per API 620 large welded steel storage tank, Section Q.3.3, including the 33 % increase permitted for earthquake loads.
Self-anchored Inner Tank
The anchorage ratio for a self-anchored inner tank, J, shall not exceed 1.0 for the OLE design combination to limit uplift and stresses in the annular plate and corner weld.
Foundation Stability
The overturning ratio defined in API 650, Section E.6.2.3, Equation (E.6.2.3-1) shall be equal to or greater than 3.0 for the defined OLE event.

Large net shell API 650 tanks or net shell of tank API 650 uplifting tanks is a tank top for the surface grid structure and the physical structure form of truss structures, thin shell structure is reasonable, mainly for the top using triangle net shell, socket type net shell or meridian reticulated shell technology for the design of API 650 uplifting tanks large-scale tank top, its great spanning capacity and uniform stress, good rigidity, less material, convenient assembly, safe and reliable.

In April 8th, 2018, our Philiphine customer purchased 1008 Tons API 5L Gr.B ERW pipes &Q345B seamless steel pipe for offshore oildfield resources drilling project. This is a regular demand almost every two month, and we has been cooperated more than three times, totally around 2100 tons API 5L Gr.B steel pipeline since 2015 year. We can supply the relative certificated for the API 5L Gr.B ERW pipes products like SGS report, B/L &Form M, and mill test certificate.

}

Inspection of weld and micro crack of API 650 uplifting tanks: the inner and outer surface of API 650 uplifting tanks, weld and heat affected zone shall be observed by naked eyes first. 100% ultrasonic testing or 100% penetrant testing are carried out for butt welds of API 650 uplifting tanks. For the defects found by 100% magnetic particle inspection, dye detection, 100% ultrasonic inspection or 100% penetrant inspection, the radiographic inspection shall be used again to ensure the accuracy of the test results.

The company has passed the ISO9001: 2008 quality system certification, strictly implemented the ISO9001 quality management system. Besides, we have continuously improved the after-sales service network to make every effort to provide more convenient, accurate and faster services for all customers. We will supervise the production, control the quality in the factory, Inspect the cargo before shipment, Issue the test report to sales department. From the steel prodcution to steel delivery, we always focus the whole process.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!