Fabrication requirements for API 650 liquid storage tanks
Bearing on FoundationsFoundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API 650 liquid storage tanks water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).
API 650 petroleum storage tanks use lightning protection, anti-static, and fire protection measures. The internal corrosion protection should be determined according to the API 650 liquid storage tanks storage medium, and the outer wall corrosion protection should be determined according to the soil quality of the buried tank.
In January 2019, one of our Vietnam customer purchased 395.62 tons Q345B steel plate API 650 liquid storage tanks for their construction project, we prepared all the goods ready within 5 days, and supplied the goods with painting sand blasting to SA2.5 API 650 liquid storage tanks and priming gray oxide primer, and arrange shipment in time. Meet the customer urgent delivery request.
}Prefabrication requirements of API 650 liquid storage tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
We have a professional after-sales service team, the company has developed a clear service process and service standards, after-sales service team members strictly perform after-sales procedures, comply with service standards. The most important thing is that we have set up the correct concept of after-sales service, "customer first, sincere service for users".