CSA G40.21 grade 38WT plates API 650 special tank

Testing the Outer Tank: While the test pressure is being held, all welded seams and connections in the outer shell and roof shall be thoroughly inspected with a solution film unless they were previously checked with a vacuum box. The API 650 special tank air pressure shall be released. Pressure relief and vacuum relief valves shall be checked by applying the design gas pressure to the outer tank, followed by evacuation of the outer space to the vacuum setting of the relief valve.

The characteristics of the API 650 special tank internal floating roof structure of API 650 petroleum storage tanks: the inner floating roof or inner floating plate refers to the floating roof that floats on the liquid surface of the oil tank with the oil and liquid up and down. The API 650 special tank inner floating roof is used to cover the liquid. The surface is currently recognized as the most ideal and most economical and practical way to reduce oil evaporation loss.

The Indonesia INKA is the only train carriage maker for railway industry in Indonesia. We cooperated with them since 2012 and supply them SPA-H steel. The SPA-H steel is used by them to fabricate train carriage. We have huge stocks for SPA-H steel and can arrange delivery for them in short time after receiving order. Meanwhile, our product API 650 special tank quality has passed their test for so many times use. Therefore, they trust us and give us repeat orders regularly. And we also do our best to support them and have never let them down though past cooperations.

}

Treatment of API 650 special tank welding defects:
1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.
2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.
3. Slag inclusion: over standard defects shall be removed and re welded.
4. Crater: weld to full after grinding.
5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.

We guarantee to provide all technical data required by users within one hour to provide reasonable quotation; to provide API 650 special tank reasonable quotation for products consulted by users within one hour; to provide investigation reception: we guarantee to receive the investigation of users at any time and provide various convenient conditions for users.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!