API Std 650 open top welded storage tanks national standards plates
These API 650 documents will define the bases of design, operation, inspection, tests, examinations, and maintenance of an API Std 650 open top welded storage tanks industrial facility. Bidders will study and analyze all this API 650 documentation, both during the preparation of the quotation and during the execution of each project activity.
In this project, an area of tank wall is constructed of ASTM A285, Grade C, steel plate that is 5/8-in. thick and has spot-radiographed, double-welded butt joints. The wall is subject to tension in a meridional direction and to compression in a latitudinal direction. The values of R1 and R2 at the point under consideration are 75 in. and 300 in. respectively. A corrosion allowance of 1/16 in. is required. The computed (meridional) tensile stress, stc, in the net thickness after deduction of the corrosion allowance is 6000 lbf/in.2. The problem in this example is to find the maximum allowable (latitudinal) compressive stress value for the given conditions, in conformance with the provisions of API 620 tank standard 5.5.4.5.
The engineering quality of API Std 650 open top welded storage tanks not only affects production and operation, but also affects the life safety of the staff. The factors affecting the API Std 650 open top welded storage tanks construction quality are all aspects, any link, any part of the problem will affect the whole project, so the quality management is paid more and more attention. How to ensure the engineering construction quality of oil tank? First, make API Std 650 open top welded storage tanks construction technical preparation carefully, understand the design intent, master the construction acceptance specification, and make detailed construction technical disclosure to the construction team.
Our vasion is to create a first-class steel plate manufacturing enterprise with international competitiveness. Business Vision: Improve value with quality and become the leader in the industry. Core values: people-oriented, integrity, responsibility, excellence. Development strategy: Seek development through science and technology, and seek benefits from management. Besides, we will create a harmonious business atmosphere, unblock the channels for employees to communicate, and build a stage for various sports and talents.
Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.
If customers have any difficult problems during use of the steel materials, they can contact the company's after-sales service department to feedback the existing problems. The after-sales department will reply as soon as possible to ensure that each customer has a good after-sales experience. Under special circumstances, the after-sales service department will start the problem-solving process, and the engineers in charge of the area will quickly follow up to solve the problem.