Wind pressure of API standard 650 carbon steel storage tanks

API 650 external floating roof storage tanks are generally called external floating roof API standard 650 carbon steel storage tanks tanks, which means that the storage tanks are externally open tanks without a dome design, and are equipped with vertical floating roofs. API 650 external floating roof storage tanks are usually used for large More than 20,000 cubic meters of open steel API standard 650 carbon steel storage tanks storage tanks for storing volatile petroleum products such as crude oil, gasoline, kerosene, etc.

Inspection of API standard 650 carbon steel storage tanks bottom: magnetic flux leakage scanning technology is used to detect the corrosion condition of API standard 650 carbon steel storage tanks bottom plate (such as corrosion depth and area, crack length, etc.). When there is a defect in the bottom plate of the API standard 650 carbon steel storage tanks, the magnetic field distribution will change and the sensor can detect it. The bottom of the oil tank should be free of foreign matters and dry during testing. Weld inspection of API standard 650 carbon steel storage tanks bottom plate: when vacuum leak test method is used to detect the tightness of oil tank bottom plate, soap water shall be applied to the weld and vacuum box shall be covered for observation.

Inspection of Welded Storage Tanks Surfaces Exposed during FabricationThe edges of API standard 650 carbon steel storage tanks plates, openings and fittings exposed during fabrication shall be inspected carefully to make sure that any defects have been uncovered, as well as to determine that the work has been performed properly.Minor defects found may be repaired only after the inspector approves the method and extent of repairs. Materials that have more than minor defects that cannot be satisfactorily repaired shall be rejected.Spot radiographic or ultrasonic examination shall be not less than 6 in. extending along the weld. Spot radiography shall comply with the standards given in 7.15.1.3. Where spot radiographic or ultrasonic examination is applied at joint intersections, the surface shall be prepared and examined for a distance of 3 in. on each side of the intersection, making the minimum length of examination 6 in. on the horizontal weld and 3 in. on the vertical weld.

Since the foundation of the company, the Spring Festival Gala is an annual activity held at the end of the year. Now it is a part of the BBN company culture to enrich the employee's life. The annual Spring Festival Gala in 2019 was held on January 20, 2020. There are opening ceremony, leader's speech, BBN steel performance, awards for outstanding employees, lucky draw, party game, curtain call, company group photo, annual Gala dinner and other links.

Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!