US Customary units API 650 ground supported flat-bottom tanks
The thickness of the overburden on the top of the API 650 oil tank should not be less than 0.5m. The surrounding backfill with clean sand or fine soil should be no less than 0.3m thick; the API 650 oil tank API 650 ground supported flat-bottom tanks operation platform ladder selection unit is considered in a unified manner. The buried operation well is designed for buried horizontal oil tanks, and the two are compatible.
Prefabricating API 650 ground supported flat-bottom tanks components before construction can improve construction efficiency, save time and cost, and is currently a common method for the construction of large vertical storage tanks. The main prefabricated components of a large vertical API 650 ground supported flat-bottom tanks include the tank body, the storage tank wall, the top of the storage tank, the bottom of the storage tank, and the accessories of the storage tank. The prefabrication of the components should follow a reasonable workflow, and carry out appropriate heat treatment and testing, so as to improve manufacturing accuracy.
Storage Tank Annular Bottom PlatesThickness shall be per API 650, Appendix E (with loads modified by requirements of this appendix) plus corrosion allowance unless a thickness increase is required for compliance with Appendix R or Appendix Q. Annular plate width shall be per API 650, Appendix E (with loads modified by requirements of this appendix) unless a width increase is required for compliance with Appendix R or Appendix Q. Thickness used for determination of API 650 welded storage tank standard, Appendix E width shall be based on the thickness required for seismic product hold down.
Every after-sales service shall have a detailed record of the customer's product problems and handling methods. The records shall be sorted into volumes and filed on a monthly basis, and submitted to the technical department for filing. The problems found in the after-sales service shall be summarized in a timely manner, discussed with the technical department, the quality inspection department and the production department, and a proper solution shall be proposed for the technical department to improve in a timely manner;
"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.