API standard 650 storage tank bottom joints
The vent pipe mouth should be 4m or more above the ground. The nominal diameter of the API standard 650 storage tank API 650 petroleum storage tank vent pipe should be no less than 50mm and a flame arrestor should be installed.
Requirements for prefabrication of the top of large vertical API standard 650 storage tank: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
The insert plate weld shall not cross any shell seams and shall be at least the greater of 10 times the shell thickness or 12 in. from any other weld in the API standard 650 storage tank shell including shell seams, shell-to-bottom weld or attachment welds. The butt weld around the periphery of the plate shall be examined over 100% of its length by both liquid penetrant method and radiographic method. The liquid penetrant examination is required on the root pass, on the back-gouged surface, and on the inside and outside finished weld surfaces. Additionally, the weld shall be vacuum box leak tested.
Our after sales department is an very important part of our department structures. After the customer receive steel materials, our after sales department will follow up regularly and solve problems for them in time if they have the needs. We romise to return the goods for free for its lifetime if it is quality of the steel material itself. Meanwhile, if you have any advice or complaints, also welcome to feed back to our after sales department, and we are trying to give better service to you.
Accept the inquiry from the owner of the goods and the inquiry by sea: master the port and price from the port of shipment to all continents and routes, and the port and price that the owner often needs to serve; the shipping schedule information of the main shipping companies; when necessary, ask the owner of the inquiry for some category information, such as the name of the goods, the level of danger, etc. (water hazard code).