ASTM A334 pipe API Std 650 liquid storage tanks

As an experienced world class steel materials supplier and exporter, logistics and fast delivery is a crucial step to us. Our logistics department and shipping department take the responsiblity to allocate and transport steel materials from our mill and warehouse to customer port or designated destination. The cooperation of the two departemts are excellent and that powerfully support our fast delivery, and strive for shorter time for customers to receive steel materials.

Under the condition of static storage without receiving and sending operation, the temperature of gas space, evaporation rate, depth and pressure of vapor in the API Std 650 liquid storage tanks will change with the change of temperature and pressure in a day. The oil loss caused by the process of discharging oil vapor and inhaling air gas is called "small breathing" loss, which is also called static storage loss of oil tanks.

Impact Tests for High Alloys
Impact tests are not required for the high-alloy (austenitic stainless steel) API Std 650 liquid storage tanks base materials, nickel alloy based materials, aluminum base materials, and weld deposited for the nonferrous (aluminum) materials. Impact tests are not required for austenitic stainless steel welds deposited by all the welding processes for services of –200°F and above. Austenitic stainless steel welds deposited for service below –200°F by all welding processes shall be impact tested in accordance with Q.6.2 except that the required impact values shall be 75% of the values as given in Q.2.2.2, Item c.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!