1100 aluminum bar API standard 650 insulated tanks

API standard 650 insulated tanks Visual InspectionUpon completion of all the foregoing tests, the pressure in the tank shall be released and a thorough visual inspection shall be made of both the inside and outside of the tank, giving particular attention to all internal ties, braces, trusses, and their attachments to the walls of the tank. Anchors shall be checked for snug tightness and adjusted if required. Anchor threads shall be fouled by peening or tack welding to prevent loosening. In lieu of thread fouling, double nuts may be used.Rate of Water Filling and Water TemperatureThe rate at which water is introduced into a tank for a hydrostatic test shall not exceed 3 ft of depth per hour. The foundation, venting equipment, or other conditions may limit the water filling to a lower rate. Pressure shall not be applied above the surface of the water before the tank and its contents are at about the same temperature.

Selection of nominal diameter D of API 650 storage tank. In the design calculation of API 650 storage tank, the bottom plate thickness is the net plate thickness, that is, the actual thickness minus the corrosion allowance. In the design and calculation of API standard 650 insulated tanks wall thickness in hydrostatic test, the thickness of bottom plate is the total thickness of steel plate.

In December, 2018, our Vietnam customer purchased 352 tons SA387Gr12Cl2 and SA387Gr11Cl2 API standard 650 insulated tanks steel plates for their tank fabrication project. The customer need those cargo urgently, and we keep many stock in warehouse , it only takes about 3days we collect total cargo for shipping to customer. The customer are very appreciate our quality and service. They API standard 650 insulated tanks become our regular customer and repeat order to us every month.

}

API standard 650 insulated tanks weld tightness test: remove dirt from the API standard 650 insulated tanks weld, apply white powder emulsion, spray kerosene on the other side of the weld after drying. Because of the strong penetration of kerosene, if kerosene is sprayed after 12 hours (under low temperature conditions, the time can be extended), if the surface of the welded seam coated with white emulsion has no spots, the welded seam meets the requirements.

From the order to the delivery, there are three quality inspections to ensure that the qualified rate of finished products is more than 100%. We promise that every order will be tracked in a timely manner to ensure that customers can receive goods safely and constantly listen to their opinions and suggestions, reflect on our own problems, and let customers feel at ease. We have a large warehouse in Shanghai and Tianjin, which can provide customers with sufficient sources of supply.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!