The highest design temperature of API standard 650 SUG II tanks
Treatment of API standard 650 SUG II tanks welding defects:1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.3. Slag inclusion: over standard defects shall be removed and re welded.4. Crater: weld to full after grinding.5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.
Responsibility of API 620 storage tanks ExaminerThe inspector shall ensure that all materials used in tanks constructed according to the rules in this standard comply in all respects with the requirements of these rules. This shall be done either by witnessing mill tests or examining certified mill test reports supplied by the Manufacturer. Storage tanks API standard 650 SUG II tanks constructed according to the rules in this standard shall be inspected and tested in accordance with the sections that follow. The inspector shall carefully follow the fabrication and testing of each tank and shall make sure that they comply in all details with the design, fabrication, and tests specified in these rules.
The vent pipe mouth should be 4m or more above the ground. The nominal diameter of the API standard 650 SUG II tanks API 650 petroleum storage tank vent pipe should be no less than 50mm and a flame arrestor should be installed.