Single-deck pontoon floating roof API Std 650 liquid storage tanks
Any joints between the adjacent sections of API 620 oil storage tank stiffening rings, as shown in Figure Q-1, shall be made so that the required moment of inertia of the combined ring-shell section is provided. Weld joints between adjacent sections shall be made with full-thickness and full-penetration butt-welds. Stiffening-ring butt-welds may employ metal backing strips. Backing strips and the associated welding shall be made in a manner that provides a smooth contour in the rat hole and all other weld joint ends. All weld passes shall be started at the rat hole and other weld joint ends and shall be completed by moving away from these ends. Passes shall be overlapped away from edges to provide a smooth continuous weld.
API 650 vertical tanks meet American Petroleum Industries (API) standards in design, material, fabrication, and testing of aboveground welded steel API Std 650 liquid storage tanksstorage tanks for use in industrial applications.
In 2013, one of our clients in Korea purchased 890 tons Q345B square tube from us for one building construction project. Our clients required no burr in the side of the tube, we finally produce the goods with great condition and +/-0.25mm tolerance for wall thickness, which is a very great tolerance with customers’ required size. Our square tube full available range is 2-16mm for wall thickness, and 40-500mm for width. In addition, our Q/C department will seriously control all of the process of every order.
}Requirements for prefabrication of the top of large vertical API Std 650 liquid storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
Due to other non-steel quality reasons caused by the customer dissatisfaction, to timely explain to the customer, and help them solve the problem, for the customer really because of their own reasons, to give patient reply.The process of objection handling is the process of our technical service.