Design temperature of API 650 special tank
This API 650 tank standard does not present orstablish a fixed series of allowable tank sizes: instead, it s intended to permit the purchaser to select whatever size API 650 special tank tank may best meet his needs.
API 650 special tank belongs to metal oil tank. Metal oil tank is a kind of vessel made by welding steel plate. The common shapes of metal tank are vertical metal tank, horizontal metal tank and spherical metal tank. The advantages of API 650 special tank etc. metal oil tank are good sealing, not easy to leak, can be installed with heating and insulation function, metal tank can withstand high internal pressure, large vertical metal tank such as API 650 special tank also has the characteristics of small floor space and large storage capacity.
API 650 special tank Pressure-relieving DevicesTanks shall be protected by automatic pressure-relieving devices that will prevent the pressure at the top of the tank from rising more than 10% above the maximum positive gauge pressure except as provided in API 620 standard 9.2.2.Where an additional hazard can be created by the exposure of the tank to accidental fire or another unexpected source of heat external to the tank, supplemental pressure-relieving devices shall be installed. These devices shall be capable of preventing the pressure from rising more than 20% above the maximum positive gauge pressure. A single pressure-relieving valve may be used if it satisfies the requirements of this paragraph and 9.2.1.
In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the diversified service demands of customer business consultation, complaint declaration, business acceptance, etc. through telephone, fax, e-mail, visit, letter, etc.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).