API standard 650 carbon steel tank roof legs
Hydrostatic TestThe API standard 650 carbon steel tank product shall be vented to the atmosphere when it is filled with or emptied of water. During water filling, the elevations of at least four equidistant points at the bottom of the tank shell and on top of the ringwall or slab shall be checked. Differential settlement, or uniform settlement of substantial magnitude, requires an immediate stop to water filling. Any further filling with water will depend on an evaluation of the measured settlement.
The floating roof is the top cover floating on the liquid level, so the sealing performance of API standard 650 carbon steel tank API 650 oil storage tank is very important. The floating plate mainly adopts elastic packing, and at the same time, it is compressed with the wall of API 650 oil storage tank with pressure strip around, and fixed with the floating plate with bolts. After the API standard 650 carbon steel tank floating plate is lowered to a certain position of about 1.8m, a prop will support the floating plate to keep it in position.
The structure of the API standard 650 carbon steel tank foundation mainly includes the insulating anticorrosion layer on the top surface of the foundation, the tank wall support, the edge retaining structure, the sand cushion, the oil and water barrier, the detection signal tube and other structures. The construction materials and requirements of each basic structure of the storage tank are different. After the structure of the API standard 650 carbon steel tank foundation is built in accordance with the construction requirements, the settlement of the storage tank foundation needs to be observed, and the uneven settlement value of the storage tank foundation should be within the allowable safety range.