API 650 aboveground petroleum storage tanks guide pole
API 650 petroleum storage tank has the advantage of long economic life: because there is no gas space on the liquid surface in the internal floating roof API 650 aboveground petroleum storage tanks storage tank, the vibration generated during the transportation of liquid inside and outside the tank is reduced.
Welding inspection of bottom plate of API 650 aboveground petroleum storage tanks, vertical oil tank: During the fabrication and installation of API 650 aboveground petroleum storage tanks, the bottom edge plate is welded first. According to the requirements of the technical standard, penetrant inspection is required for the weld of edge plate at the bottom of API 650 aboveground petroleum storage tanks, that is, penetrant testing is required for each weld bead priming, filling and capping. In the process of testing, if any defect is found, it shall be repaired immediately. After the repair, the surface coloring penetrant test shall be conducted again until the test result is qualified.
In cylindrical tank walls, the longitudinal weld joints in adjacent shell courses, including compression ring welds, shall be offset from each other a minimum distance of 12 in. The butt-weld around the periphery of a thickened insert plate, or the fillet weld around the periphery of a reinforcing plate, shall be at least the greater of 10 times the shell thickness or 12 in. from any butt-welded seam or the bottom-to-shell or roof-to-shell joint. As an alternative, the insert plate (or the API 650 aboveground petroleum storage tanks reinforcing plate in an assembly that does not require stress relief) may extend to and intersect a flat-bottom-to-shell corner joint at approximately 90 degrees.
Our quality control department will do inspection for details of the steel materials API 650 aboveground petroleum storage tanks before delivery. We would invite the customer side to attend the inspection together. If they can not come, we will also take rich pictures for them to check. Meanwhile, we will publish inspection report and send them the PDF version. Besides, we accept any third party inspection such as SGS, BV, etc. And our quality control department will support the third party to inspect the steel materials smoothly and try our best to deliver the qualified steel materials to customers earlier.
In particular, the EU imports a large amount of iron ore from central and South America and Oceania, which are mainly transported by sea. The perfect port infrastructure makes the port operation cost of EU iron ore raw materials import relatively low. However, the API 650 aboveground petroleum storage tanks steel transportation between EU Member States is mainly railway transportation, and the EU member states have established a very developed railway network and railway information infrastructure.