A350 grade LF1 forgings API Std 650 welded aluminum storage tanks

For employees' development,  the company's transformation and development provides employees with a broad career development platform. The company needs "lion-type" entrepreneurial leaders who are full of entrepreneurial enthusiasm and dare to self-renovate. They also need a large number of professional and professional high-quality talents, and employees can get full capacity to display opportunities.All welded seams in the API Std 650 welded aluminum storage tanks bottom, and complete penetration and complete fusion sidewall-to-bottom welds, shall be inspected by means of a vacuum box test as described in Q.8.2.1. Sidewall-to-bottom welds not having complete penetration and complete fusion shall be inspected by means of either a vacuum box test of the inside weld as described in API 620 specification Q.8.2.1, or where approved by the Purchaser, a direct pressure solution film test as described in Q.8.2.2.This specification, in conjunction with API 650 Standard, prescribes minimum standards for the API Std 650 welded aluminum storage tanks design, supply fabrication, erection, and testing of field erected welded steel storage tanks complete with accessories as specified herein and as shown on attached datasheets and/or drawings.Safety production is the cornerstone of enterprise survival and development. The company established a safety management network, which achieved clear powers and responsibilities, clear responsibilities, effective management and control, and provided organizational guarantee for safe production. The company strictly complies with the "Environmental Protection Law", establishes an effective environmental protection emission control system and waste gas, waste water, waste solid recycling system, and makes great efforts to harden, lighten, green, and beautify the plant, and strive to build green steel enterprises.Prefabrication requirements of API Std 650 welded aluminum storage tanks, large vertical storage tank wall panels:
1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.
2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.
3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!