48m diameter API 650 aboveground welded storage tanks

Corrosion allowance, if specified, shall be added to calculated API 650 tanks shell and self-supporting roof thicknesses; to minimum nominal thicknesses of bottom and supported API 650 aboveground welded storage tanks roof plates; to nozzles and manholes; and to all exposed surfaces of internal structural members and non-removable internals.

Generally, the building area temperature of the API 650 aboveground welded storage tanks should be considered before the tank design and construction. The temperature in the API 650 aboveground welded storage tanks building area is closely related to the evaporation loss, energy loss, storage tank materials and the selection of detection instruments, or has a direct impact on the storage cost of the storage liquid. For the same medium, the higher the air temperature and the longer the duration, the higher the material temperature in the API 650 aboveground welded storage tanks, the higher the corresponding pressure and the more volatile loss.

API 650 aboveground welded storage tanks Visual InspectionUpon completion of all the foregoing tests, the pressure in the tank shall be released and a thorough visual inspection shall be made of both the inside and outside of the tank, giving particular attention to all internal ties, braces, trusses, and their attachments to the walls of the tank. Anchors shall be checked for snug tightness and adjusted if required. Anchor threads shall be fouled by peening or tack welding to prevent loosening. In lieu of thread fouling, double nuts may be used.Rate of Water Filling and Water TemperatureThe rate at which water is introduced into a tank for a hydrostatic test shall not exceed 3 ft of depth per hour. The foundation, venting equipment, or other conditions may limit the water filling to a lower rate. Pressure shall not be applied above the surface of the water before the tank and its contents are at about the same temperature.

The business department is mainly responsible for communicating with customers, from the manufacturing of steel plates, steel pipes and other products, knowing customers' needs and processing conditions, etc. within the time agreed with customers, the delivery time is short, the price is the most competitive, and the service is the best. Their responsibilities are to deal with customer consultation, solve customer problems, update production plans, and instruct the logistics department to deliver products to customers.

In addition to our own truck fleet, we also have long-term cooperation with certain logistics companies to ensure that we can deliver API 650 aboveground welded storage tanks goods in time and smoothly. At the same time, because of the long-term cooperation and huge shipping volume, we can get a good transportation price and save transportation cost for the company and customers. Meanwhile, we have Shipping Department to arrange shipping work in advance. So as not to waste time on transportation both in land and on the sea.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!