Before the start of erection, inspect each API 650 tank foundation to ensure that it is level and acceptable to receive Work. Remove temporary erection attachments welded to the interior or exterior of the API 650 insulated tanks shell or to the bottom by arc gouging, and grind weld area smooth.

During heavy rain, closely observe the change of the water level in the storage area of the API 650 insulated tanks. If the water level rises to the dangerous range, drain the water immediately. There are more thunderstorms in heavy rain, and lightning protection devices should be installed in the API 650 insulated tanks area to avoid lightning accidents. Observe the groundwater level of the API 650 insulated tanks area at any time, clean and dredge the drainage ditch in time to ensure unobstructed drainage, and prevent the bottom of the API 650 insulated tanks from leaking and rusting due to untimely drainage.

Impact Test Requirements for Oil storage tanks Primary Components
All API 650 insulated tanks primary components of 9% or 5% nickel steel shall be impact tested in accordance with Q.2.2.2 through Q.2.2.4. Impact testing is not required for primary components of austenitic stainless steel, nickel alloy, and aluminum materials. Welds in high-alloy (austenitic) stainless steel shall be impact tested if required by Q.6.3.
Impact testing of plates, including structural members made of plate, shall comply with the following:a)Impact test specimens shall be taken transverse to the direction of final plate rolling. b)Charpy V-notch specimens shall be cooled to a temperature of –320°F for A353, A553, and A645 steels for impact testing.

The company has a group of mature steel plate production and processing line construction and production management experience. In addition, the company has professional and technical personnel. BBN steel is a modern enterprise integrating scientific research and development, production processing, sales and service. The company now has finance department, production department, sales team, technical department, quality control department, logistics department and after-sales service team. At the same time, it also adheres to international standards and adheres to the international line.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!