Nominal diameter of API 650 stainless and carbon steel tank

The outer FRP of API 650 oil tank will not produce electrolytic corrosion with groundwater and brine. The outer FRP will not corrode with gasoline, diesel oil and leaded gasoline API 650 stainless and carbon steel tank. The leakage detector can monitor the whole process 24 hours to eliminate the potential pollution. The leakage detection system is convenient for the inspection and maintenance of API 650 oil tank, and protects the original ecological environment of soil and groundwater.

Requirements for prefabrication of the top of large vertical API 650 stainless and carbon steel tank: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.

Design of a Double-wall Tank
The outer bottom, shell, and roof of a double-wall tank shall enclose an insulating space around the bottom, shell, and roof or insulation deck of the inner tank that contains the stored liquid. The annular space shall be maintained at a low positive pressure, which necessitates that the enclosure be vapor-tight. The Purchaser shall specify the design metal temperature and pressure of the inner tank and may specify the design temperature and pressure of the outer tank API 650 stainless and carbon steel tank. The Purchaser shall state the specific gravity of the content to be stored, roof live loads, wind load, earthquake load where applicable, and corrosion allowance, if any.

The company has a perfect after-sales service system and quality assurance system. The company adheres to the service principle of "all for users", and has established a professional after-sales service team. In the future service process, the after-sales service adopts regular return visit for customers. Timely understand the customer's satisfaction with our products, and solve the user's problems at any time.

The company has huge steel API 650 stainless and carbon steel tank products stock all the year round to meet the urgent needs of customers. For stock products, we can arrange delivery within 3 days. The transportation department and shipping department shall coordinate and follow up to update the progress to customers regularly, i.e. where the goods have arrived, so as to let customers not worry and rest assured. Think about what the customers think and what the customers are anxious about, solve problems for customers efficiently and effectively, is the direction of our unremitting efforts.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!