Large API 650 unanchored flat-bottom tank

The outer FRP of API 650 oil tank will not produce electrolytic corrosion with groundwater and brine. The outer FRP will not corrode with gasoline, diesel oil and leaded gasoline API 650 unanchored flat-bottom tank. The leakage detector can monitor the whole process 24 hours to eliminate the potential pollution. The leakage detection system is convenient for the inspection and maintenance of API 650 oil tank, and protects the original ecological environment of soil and groundwater.

For the welding of API 650 unanchored flat-bottom tank bottom, attention should be paid to the slag removal and drying of the welding joint before welding, and there is no sediment and oil contamination in the lap joint of steel plate. The manufacturing quality and production efficiency of the central plate can be obviously improved by adopting the rolling central plate. The butt joint is used between the rolling plates to improve the installation conditions of the central plate at the bottom of the API 650 unanchored flat-bottom tank. The welding sequence of the central plate is from the center of the central plate to the surrounding.

The hardness of the welds contacting these environments, including the heat-affected zones, shall be considered. The weld metal and adjacent heat-affected zone often contain a zone of hardness that is well in excess of a value of 22 on the Rockwell C scale and could be expected to be more susceptible to cracking than would unwelded metal. Any hardness criteria shall be a matter of agreement between the Purchaser and the API 650 unanchored flat-bottom tank manufacturer and shall be based on an evaluation of the expected hydrogen sulfide concentration in the product, the possibility of moisture being present on the inside metal surface, and the strength and hardness characteristics of base metal and weld metal.

The business department is mainly responsible for communicating with customers, from the manufacturing of steel plates, steel pipes and other products, knowing customers' needs and processing conditions, etc. within the time agreed with customers, the delivery time is short, the price is the most competitive, and the service is the best. Their responsibilities are to deal with customer consultation, solve customer problems, update production plans, and instruct the logistics department to deliver products to customers.

Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!