ISO 630 plates API Std 650 storage tank
Fixed roof API 650 oil storage tank includes inner floating roof tank, which API Std 650 storage tank can effectively prevent sand, rain, snow or dust from polluting the storage liquid. Under various weather conditions, API 650 oil storage tank can ensure the quality of liquid storage, which is called "all-weather API Std 650 storage tank storage tank".
Design of Reinforcement for Single Openings in Tank WallsThe 20 in. x 29 in. obround manhole shown in Figure F-5 is located in solid plate in the sidewall of a cylindrical storage tank 45 ft in diameter in an area where the thickness of the wall plate, tw, is 1/2 in. No corrosion allowance is required. The total internal pressure, Pl + Pg, at the horizontal centerline of the opening is 27.5 lbf/in.2 gauge. The thickness of the wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.485 in. The manhole neck is fabricated by welding from 3/8 in. plate. The materials in the API 620 tank wall, the manhole neck, and the reinforcing pad conform to ASTM A516 Grade 60. The joints in the welded steel storage oil tank wall and the longitudinal joint or joints in the manhole neck are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.
When welding API Std 650 storage tank, in order to avoid weld deformation, it is necessary to use corresponding welding process according to the type of steel used in the tank, such as welding requirements of steel plate, welding position, etc. Reasonable arrangement of the assembly sequence, the use of subsection back welding and jump welding method, strict control of welding process parameters, rigid fixation measures, take corrective measures for deformation compensation are necessary.
Enterprise Motto:Integrity, harmony, dedication, innovation and developmentAbility is the cornerstone of success; action is the ladder of successGrow with the enterprise; progress with the enterpriseGive a platform to those who actually do things and a stage to those who successfully do thingsDare to be the first, to pursue excellence.
"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.
The company strengthens process management and pays attention to assessment. One of the key points of good service is to strengthen the process management and improve the evaluation mechanism. Make the after-sales service system more perfect and provide better service for customers.