ASTM A53 pipe API 650 unanchored tanks
Our company will set up a full-time service engineer for the project, who is responsible for the interface and coordination of technical support and after-sales service of the API 650 unanchored tanks project. In response process of customer service center, in case of technical support and after-sales service demand, the user shall contact the full-time engineer of API 650 unanchored tanks customer service center, and the technical personnel will give corresponding answers and on-site treatment according to the needs of users.Determination of Required CapacityThe aggregate capacities required for any vent valves, pressure-relieving valves, and/or vacuum-relieving valves to be provided should be determined as follows:a)For thermal breathing and product movement, the rules given in API 2000 shall be followed. The required capacity as the result of the product movement into the tank API 650 unanchored tanks given in API 2000, shall be multiplied by the ratio of the absolute tank pressure to atmospheric pressure (14.7 lbf/in.2 absolute).b)For supplemental safety pressure-relieving devices to take care of extra venting capacity required in case of external fire exposure, the rules in API 2000 shall be followed.API 650 petroleum storage tanks are used for API 650 unanchored tanks storage. API 650 petroleum storage tanks can be made of carbon steel, austenitic stainless steel and nickel alloy (only for low temperature). Welding API 650 unanchored tanks certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For API 650 petroleum storage tanks, non-destructive inspections are required, but third-party inspections are not required.Firmly establish the "people-oriented, safe development" concept, strictly follow the safety production policy of "safety first, prevention first, comprehensive management", strengthen and improve the management and supervision of safety production in an all-round way, and strive to improve the controllability of safety management And effectiveness, cultivate safety culture, improve long-term safety production mechanism, and build a harmonious BEBON.The construction period comparison of mechanical cleaning and manual cleaning for vertical storage tank, API 650 unanchored tanks. The API 650 unanchored tanks mechanical cleaning period is short, and the construction period is not affected by the size of the storage tank and the amount of sludge in the tank, and the cleaning equipment operates 24 hours a day. The manual cleaning of the API 650 unanchored tanks has a long construction period, which is easily affected by the external environment, and the number of workers is limited by the size of the storage tank and the amount of sludge.
Latest NewsMore+