API Std 650 SUG III tanks qualification of welding procedures

The technology center has always been focusing on application research, improving market realization and scientific and technological contribution rate; taking user demand as the goal, highlighting the personalized development of products; taking the joint development of industry, University and research, and technology integration as the means, improving the starting point and level of innovation, and realizing the breakthrough of core technology; taking advanced research as the guide, pursuing the leap of technological development; taking system and mechanism innovation as the driving force, Promote and realize the working concept of technological innovation.

The preparatory work before the construction of the API Std 650 SUG III tanks is directly related to the quality assurance, project progress, construction safety and other aspects of the entire oil tank project. Therefore, the preparation work before the API Std 650 SUG III tanks construction should be paid attention to and planned. Before API Std 650 SUG III tanks construction, you need to prepare conventional machinery, materials, and facilities, as well as the quality control of the project, such as the installation method of the API Std 650 SUG III tanks, the welding method of the steel plate, and the inspection of the tank material. In addition, there is the most important item, construction safety protection.

Except as permitted by API standard 620 Q.8.6, the test shall be conducted after the entire tank is complete, before the insulation is applied. Except as limited by foundation or stress conditions, the test shall consist of filling the tank with water to the design liquid level and applying an overload air pressure of 1.25 times the pressure for which the vapor space is designed. The load on the supporting foundation shall preferably not exceed the established allowable bearing value for the tank site. Where a thorough evaluation of the foundation justifies a temporary increase, the established allowable bearing may be increased for the test condition, but the increase shall be not more than 25%.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!