API Std 650 open top welded storage tanks with berm foundations
When talking about our team, it is hard not to mention our QC department (Quality Control). We have built strict qualitycontrol system to guarantee the steel quality. During the steel materials production, we have strict monitoring measures and indicators, and ensure no chemical composition, mechnical properties and so on technical problems for the steel materials API Std 650 open top welded storage tanks. After production, our QC department will conduct another inspection regarding to the steel quantity, dimension, mark and so on points before delivery.Shell Stiffening Rings for Tanks That Contain LiquidInternal or external shell stiffening rings may be required to maintain roundness when the tank is subjected to wind, vacuum, or other specified loads. When API Std 650 open top welded storage tanks stiffening rings are required, the stiffener-to-shell weld details shall be in accordance with Figure Q-1 and Q.3.5.2 through Q.3.5.5.Three-plate laps or butt-weld junctions in tank bottoms shall be not closer than 12 in. from each other or from the butt-welds of the annular plates.Bottom plates, other than annular bottom plates for a 9% or 5% nickel steel or stainless steel tank that contains liquid, may have a minimum thickness of 3/16 in. exclusive of any specified corrosion allowance.Storage tanks API Std 650 open top welded storage tanks designed in accordance with the rules and guidelines of API 650 are called API 650 storage tanks. API 650 is a control rule for welded storage tanks that work normally in the normal pressure range."Hard and solid, honest commitment, practical effect". To strive for a solid enterprise foundation with hard work style; to promise first-class enterprise service with honest faith; to create efficient enterprise performance with practical spirit.The preparatory work before the construction of the API Std 650 open top welded storage tanks is directly related to the quality assurance, project progress, construction safety and other aspects of the entire oil tank project. Therefore, the preparation work before the API Std 650 open top welded storage tanks construction should be paid attention to and planned. Before API Std 650 open top welded storage tanks construction, you need to prepare conventional machinery, materials, and facilities, as well as the quality control of the project, such as the installation method of the API Std 650 open top welded storage tanks, the welding method of the steel plate, and the inspection of the tank material. In addition, there is the most important item, construction safety protection.
Latest NewsMore+