API Std 650 low-alloy steel tanks restrictions on stiffening rings
Aftershock Level Earthquake (ALE)This design case shall be applicable only when regulations or project documents specifically require the tank system to be designed or evaluated for aftershocks.If the outer tank is not designed as a secondary containment (i.e. it serves as vapor barrier and pressure boundary only and is not constructed of API 620 material suitable for the inner tank API Std 650 low-alloy steel tanks), then no design or evaluation for ALE is required by these provisions for the inner or outer tank.
For API 650 tanks Projection from outside of tank shell to extreme face of flange - plus or minus 5 mm. API Std 650 low-alloy steel tanks Elevation or radial location - plus or minus 6 mm. API 650 tanks Flange tilt in any plane, measured on the diameter across the gasket surface - plus or minus degree but not exceeding 5 mm. Flange bolt hole orientation - plus or minus 2 mm.
Good news: In May 17th, 2018, the Myanmar navy's local representative visit our office and hot rolled plate production line, and sign another contract 2025 tons LR A shipbuilding steel plates API Std 650 low-alloy steel tanks order in our office. With the fast development in Myanmar, Myanmar navy build frigate every year. Bebon cooperated with Myanmar Navy company from from 2015. They purchased 412 ton LR AH36 ship steel plate from Bebon as trial order in 2015. After receiving the goods, they speak highly of the quality and bebon's service. After that they purchase the shipbuilding steel plate from bebon regularly.
}The preparatory work before the construction of the API Std 650 low-alloy steel tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API Std 650 low-alloy steel tanks:Before API Std 650 low-alloy steel tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.