API Std 650 horizontal tank with tall shells
When the API Std 650 horizontal tank top shell course is the minimum thickness indicated in 5.10.4, Table 5-6 and Figure 5-6, details a – e, h and i, the minimum anchorage shall be designed for normal loads as specified by the Purchaser and by this standard. See 5.11.2.3 for the allowable stress. When the top shell course is thickened beyond the minimum thickness provided in Table 5-6 or as in Figure 5-6, details f and g, or a knuckle is used, the minimum anchorage shall be designed for three times the internal design pressure. The allowable stress for this loading is 90% of the minimum specified yield strength of anchorage material.
API 650 stipulates that an open tank should be provided with a wind-resistant ring to ensure that the API Std 650 horizontal tank tank body maintains its roundness when subjected to wind. There are no hard and fast rules for vault API 650 storage tanks. It can be determined by comparing the equivalent wall height with the maximum height of the unreinforced tank wall.
We supply 5800 tons A53 Gr B ERW pipes to Qatar for Qatar Integrated Railway Project - Green Line. This is the first Metro Line in Qatar, and it is located in Doha. We got the order by tender, launched by the Qatar Railways Company for designing, construction and completion of Green Line Project. Before putting order, a delegation from the API Std 650 horizontal tank project side visited us and several other famous steel pipe mills in China for 15 days. Finally, we were chosen and finished the task exceeding their expectations.
}Weld inspection of API Std 650 horizontal tank, vertical oil tank wall plate: In the welding inspection process of oil tank wall plate, attention should be paid to the defects of thick wall plate, such as incomplete penetration, incomplete root fusion and cracks. If there is a root incomplete penetration defect, it is necessary to open the weld joint with carbon arc air gouging and grinding machine grinding, or even weld through, and then weld again after the defect is removed.
The company strengthens process management and pays attention to assessment. One of the key points of good service is to strengthen the process management and improve the evaluation mechanism. Make the after-sales service system more perfect and provide better service for customers.