API Std 650 ground supported flat-bottom tanks with internal floating roofs

The quality inspection department is responsible for the inspection management of raw materials and finished products, and the quality inspection and acceptance of products and raw materials. Strictly abide by the company's management system, conscientiously exercise the management power given by the company, and put an end to all ultra vires; be responsible for the inspection of all kinds of raw materials entering the company, and put forward quality problems and handling opinions.Materials for API Std 650 ground supported flat-bottom tanks primary components shall comply with the requirements of Tables R-1 and R-2. All primary components shall be impact tested in accordance with R.2.1.2 through R.2.1.4. Impact testing of API 620 welded storage tanks plates, including structural members made of plate, shall comply with Table R-1. Impact test specimens shall be taken transverse to the direction of final plate rolling.BBN can provide design, manufacture and installation of API 650 large oil and crude oil storage tanks. We can build a API Std 650 ground supported flat-bottom tanks 7,000,000 gallon API 650 petroleum storage tank. In addition, BBN has the means to construct multiple storage tanks at the same time. We are very experienced in providing API 650 petroleum storage tanks.The company always adheres to the concept of green production, follows the development path of innovation, transformation and improvement, and has carried out in-depth cooperation with Zhengzhou University and other scientific research institutes, planning from a high starting point, strict standard design, and successfully implementing engineering projects With nearly 20 research and development projects, the company's production technology and equipment are at the forefront of the industry, and indicators such as environmental protection, energy consumption, cost, and resource utilization have reached the advanced level in the industry.Requirements for prefabrication of the top of large vertical API Std 650 ground supported flat-bottom tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!