API standard 650 SUG I tanks reinforcing plates
For API 650 tanks Projection from outside of tank shell to extreme face of flange - plus or minus 5 mm. API standard 650 SUG I tanks Elevation or radial location - plus or minus 6 mm. API 650 tanks Flange tilt in any plane, measured on the diameter across the gasket surface - plus or minus degree but not exceeding 5 mm. Flange bolt hole orientation - plus or minus 2 mm.
Structural shapes of 9% and 5% nickel steel may be furnished to the chemical and physical requirements of ASTM A353, A553, or A645. Physical tests shall be in accordance with the requirements of ASTM A6. API standard 650 SUG I tanks used Piping, Tubing, and ForgingsMaterial used for piping, tubing, and forgings shall be compatible in welding strength, and thermal expansion coefficient with the tank shell material. In addition to the specific requirements of this appendix, all piping within the limitations of 1.3.2 shall fulfill the minimum requirements of ASME B31.3.
Under the condition of static storage without receiving and sending operation, the temperature of gas space, evaporation rate, depth and pressure of vapor in the API standard 650 SUG I tanks will change with the change of temperature and pressure in a day. The oil loss caused by the process of discharging oil vapor and inhaling air gas is called "small breathing" loss, which is also called static storage loss of oil tanks.
In order to better develop the international steel market and make the steel products trade more prosperous at home and abroad, the company has a number of professional talents who love their posts and are proficient in their business. The company has always been adhering to the "service first, reputation first, customer first, make friends" business purpose, is willing to work together with domestic and foreign customers!
Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.
The company has passed the ISO9001: 2008 quality system certification, strictly implemented the ISO9001 quality management system. Besides, we have continuously improved the after-sales service network to make every effort to provide more convenient, accurate and faster services for all customers. We will supervise the production, control the quality in the factory, Inspect the cargo before shipment, Issue the test report to sales department. From the steel prodcution to steel delivery, we always focus the whole process.