API standard 650 flexible liquid storage tanks lining

Bearing on Foundations
Foundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API standard 650 flexible liquid storage tanks water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).

Welding certification is regulated by Section 10 of the American Society of Mechanical Engineers (ASME). For both API standard 650 flexible liquid storage tanks storage tank API 650, non-destructive inspection is required, but third-party inspection is not required.

On September 14th 2019, a Australia customer purchased 500 tonsDIN17155 15Mo3 boiler steel plates, which will be used for vessel modification of wax backflow protection project and LPU project. Many old customers keep asking about Din17155 steel grade-15Mo3. Usually our company would suggest customers to choose EN10028 steel specification, but if customer insiste on the old steel grade, we could arrange it either. With years of experience in produceing DIN 17155 15Mo3 boiler steel plates, the company supplies high quality steel API standard 650 flexible liquid storage tanks product with low cost and better service.

}

Treatment of API standard 650 flexible liquid storage tanks welding defects:
1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.
2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.
3. Slag inclusion: over standard defects shall be removed and re welded.
4. Crater: weld to full after grinding.
5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.

Provide special product requirements to meet the personalized needs of customers. The API standard 650 flexible liquid storage tanks company arranges production and shipment strictly according to the contract, and guarantees to supply goods according to the time agreed in the contract. Provide professional consultation: we guarantee to answer any professional and API standard 650 flexible liquid storage tanks technical questions raised by users within 1 hour; provide detailed information.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!