API standard 650 carbon steel storage tanks impact tests
Structural shapes of 9% and 5% nickel steel may be furnished to the chemical and physical requirements of ASTM A353, A553, or A645. Physical tests shall be in accordance with the requirements of ASTM A6.API standard 650 carbon steel storage tanks used Piping, Tubing, and ForgingsMaterial used for piping, tubing, and forgings shall be compatible in welding strength, and thermal expansion coefficient with the tank shell material. In addition to the specific requirements of this appendix, all piping within the limitations of 1.3.2 shall fulfill the minimum requirements of ASME B31.3.
The thickness of the overburden on the top of the API 650 oil tank should not be less than 0.5m. The surrounding backfill with clean sand or fine soil should be no less than 0.3m thick; the API 650 oil tank API standard 650 carbon steel storage tanks operation platform ladder selection unit is considered in a unified manner. The buried operation well is designed for buried horizontal oil tanks, and the two are compatible.
Bangladesh is an important market to us. We cooperated with the National Railway, the National Tubes Limited (NTL) and so on state-owned enterprises. They have tenders regularly. And we would participate the tenders with our local agents. We have been the winner of NTL tenders for many times. API 5L grade B steel strips are their needed API standard 650 carbon steel storage tanks materials. They have special chemical composition, tolerance and so on requirements. We can fully meet their demands and guarantee timely delivery.
}Generally, the snow load in the API standard 650 carbon steel storage tanks construction area should be considered before the design and construction of the tank. The snow load in the API standard 650 carbon steel storage tanks construction area has an impact on the tank roof design and operation, especially in the area with large snow load, the roof load of large storage tank with large diameter increases. Anti freezing, heat preservation and waterproof measures shall be taken for the additional facilities of storage tanks, such as pumps, breathing valves, flame arresters, detection instruments and thermal insulation layers.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.