API 650 ground supported tanks resistance to design loads
Considering the large workload of allocation and transportion for our steel materials, we have built special shipping department, and make it independent form transportation department. The transportation department is in charge of transporting steel materials from our mill and warehouse to the port, and our shipping department is in charge of the shipping matters. So that our whole shipping efficiency is improved, and shorten time for customers to receive goods.
Generally, the snow load in the API 650 ground supported tanks construction area should be considered before the design and construction of the tank. The snow load in the API 650 ground supported tanks construction area has an impact on the tank roof design and operation, especially in the area with large snow load, the roof load of large storage tank with large diameter increases. Anti freezing, heat preservation and waterproof measures shall be taken for the additional facilities of storage tanks, such as pumps, breathing valves, flame arresters, detection instruments and thermal insulation layers.
All API 650 ground supported tanks fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole, and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.