API 650 floating-roof tanks seismic overturning moment
The insert plate weld shall not cross any shell seams and shall be at least the greater of 10 times the shell thickness or 12 in. from any other weld in the API 650 floating-roof tanks shell including shell seams, shell-to-bottom weld or attachment welds. The butt weld around the periphery of the plate shall be examined over 100% of its length by both liquid penetrant method and radiographic method. The liquid penetrant examination is required on the root pass, on the back-gouged surface, and on the inside and outside finished weld surfaces. Additionally, the weld shall be vacuum box leak tested.
API 650 vertical tanks meet American Petroleum Industries (API) standards in design, material, fabrication, and testing of aboveground welded steel API 650 floating-roof tanksstorage tanks for use in industrial applications.
With the fast development in Myanmar, Myanmar navy build frigate every year. We Cooperate with Myanmar Navy from 2015. They purchased 412 ton LR AH36 steel plate from us as trial order in 2015. After receiving the API 650 floating-roof tanks goods, they speak highly of the quality and our service. After that they purchase the shipbuilding steel plate from us regularly. In May,2018, the Myanmar navy’s local representative visit our office and production line, and sign another contract 2025 ton steel order in our office.
}The head of API 650 floating-roof tanks etc. vertical oil tank is the end cover on the top of vertical oil tank. It is used to separate the oil stored in the tank and the medium outside the tank, and also used to bear the pressure on the top of the vertical oil tank. The quality of the head is closely related to the long-term safety of the API 650 floating-roof tanks. The head surface can be divided into convex shape, cone shape and flat shape according to its shape. The oil tank head can not be disassembled after welding.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.