API 650 flat-bottom tanks testing of the roof
Under the action of the earthquake, API 650 storage tank is mainly damaged by the phenomenon of the lower part of the API 650 flat-bottom tanks tank wall. Therefore, the key point of seismic calculation is to prevent the tank wall from buckling under axial pressure.
Impact Tests for High AlloysImpact tests are not required for oil steel storage material nickel alloy welds made with electrodes/filler metals covered by AWS Specification A5.11 or AWS Specification A5.14, provided the nominal nickel content is 50% or greater, and the weld is deposited by the shielded metal-arc welding (SMAW), gas metal-arc welding (GMAW), gas tungsten-arc welding (GTAW), or plasma-arc welding (PAW) processes. When A5.11/A5.14 specifies the nickel content as a “remainder,” the nickel content shall be determined by summing the maximum specified values of the other elements (use the average specified value for elements with specified ranges) and subtracting from 100%.
Prefabrication requirements of API 650 flat-bottom tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
Since its inception, the company has always adhered to the development policy of "survival with quality, development with products, cooperation with credibility, and service with customers". I would like to express my heartfelt thanks to the old and new friends and customers who have always given care, support and help to the company! And sincerely hope to establish a long-term cooperative relationship with them, mutual benefit and common development.
The company's logistics team adheres to the development concept of “gathering advantages, providing superior services, creating value, and leading the market”, and tightly focuses on the strategic positioning of “developing large-scale steel logistics and building large-scale steel supermarkets”. Facing the whole country and integrating into the world to build an "one center, one network" international circulation system. Through the development of 5-10 years, it is expected to form a modern steel industry with annual operating income exceeding 2.5 billion yuan.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.