API 650 carbon and low-alloy steel tanks spectral acceleration coefficients

API 650 petroleum storage tank stipulates that if the thickness of the lower siding obtained by calculating the anti-overturning moment is greater than the thickness of the API 650 carbon and low-alloy steel tanks hydrostatic pressure test (both do not include the corrosion margin), the calculated thickness of the above siding required by the hydrostatic pressure is It should also be increased by the same proportion, unless special analysis is performed to determine the seismic overturning moment and corresponding stress at the bottom of each layer of API 650 petroleum storage tank wall.

Investigation of Subgrade
On actual steel storage tank sites to be used, test borings or test pits, or both, may be made at the direction of a competent engineer who will specify the number and location. They need not be equally spaced but should be laid out to uncover possible weak spots.
In general, test loadings of subgrade at the bottom of test pits need be resorted to only when such heavy loading as may be imposed by footings for major column supports for spheres or similarly elevated API 620 low-pressure tanks is specified. Results may be deceptive if average load-bearing capacity over a considerable area is wanted. All field data shall be recorded with maps, and copies shall be supplied to all engineers concerned with design, erection, and later operation.

The preparatory work before the construction of the API 650 carbon and low-alloy steel tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API 650 carbon and low-alloy steel tanks:
Before API 650 carbon and low-alloy steel tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

Firmly establish the "people-oriented, safe development" concept, strictly follow the safety production policy of "safety first, prevention first, comprehensive management", strengthen and improve the management and supervision of safety production in an all-round way, and strive to improve the controllability of safety management And effectiveness, cultivate safety culture, improve long-term safety production mechanism, and build a harmonious BEBON.

As we all know, steel pipes occupy more space in the process of transportation. If there is no good way of packing, the transportation cost for steel pipes will be a big expense. In view of this characteristic, our company is ingenious and adopts the nest package method to solve this problem perfectly. The premise of the nest package is that the diameters of the steel pipes are different, and the small diameter pipe is inserted in the large diameter pipe. This not only saves the volume, but also saves the transportation cost. It also reduces the loading and unloading workload by half, saves precious time, and enables customers to receive goods earlier.

After-sales service team is a key department to test the steel quality. Product quality is always the foundation of our survival and development. The company's full inspection from raw materials to finished products; and implements standardized, scientific, and strict internal quality control and management systems in accordance with the process flow during the production process; products can only leave the factory if qualified, and follow-up problem solving systems are implemented in after-sales services to guarantee the customers’ interest.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!