API 650 aluminum storage tanks height

Customer service center has provided after-sales service for many large-scale information systems, and has accumulated rich working experience in the process of API 650 aluminum storage tanks service for many years. It can provide accurate, timely and high-quality support and service for users, which is well received by users.API 620 Steel Oil Tank Bottom and Shell Support
The tank API 650 aluminum storage tanks under-bottom insulation shall be designed to resist the combined pressures from the product load, the overturning seismic load and the vertical seismic load. These seismic pressures may be combined by SRSS.
The bearing ring under the shell shall be designed to resist the calculated OLE peak compressive force in the tank shell due to overturning (see API 650 oil tank, Section E.6.2.2), including dead and live loads. A 33 % increase in allowable bearing stress is permitted.API 650 internal floating roof oil tank is a volatile liquid storage tank with a combination of a dome tank and an internal floating roof structure, which is a floating roof assembled under the dome of the API 650 aluminum storage tanks storage tank. The combination of the vault roof outside the API 650 storage tank and the floating roof inside the tank has been widely used in gasoline, aviation kerosene and more volatile chemical liquids.We had a wonderful trip in Phuket Island, Thailand. At the end of 2019, in order to thank employees for their hard work for a year and enrich their lives, our company organized a pleasant trip to Phuket Island, Thailand. The tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5 o'clock in the afternoon on the 22th December.Prefabrication requirements of API 650 aluminum storage tanks, large vertical storage tank wall panels:
1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.
2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.
3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!