A537Cl1 plates API Std 650 anchored liquid-storage tanks
The impact tests for API 620 welded storage tanks used pipe (including structural members made of pipe), bolting, and forgings, shall be in accordance with ASTM specifications ASTM A333 (seamless only) pipe, ASTM A36 Mod 1 plate, ASTM A131 Grades CS, D, and E steel plate, ASTM A633 Grade A CSA G40.21 Grades 38WT, 44WT and 50WT high-strength low-alloy structural steel plate, ASTM A350 carbon and low alloy steel forgings, and ASTM A320 Grade L7 bolts.
API 650 can store oil, gas, chemical, water and biofuel for some of the most common tanks in the oil industry. API 650 can store contents at a lower pressure (maximum of 2 PSI) but at much higher temperature (-40 degrees F to 500 degrees F) than the standards of API Std 650 anchored liquid-storage tanks. It can be any tank size.
With the fast development in Myanmar, Myanmar navy build frigate every year. We Cooperate with Myanmar Navy from 2015. They purchased 412 ton LR AH36 steel plate from us as trial order in 2015. After receiving the API Std 650 anchored liquid-storage tanks goods, they speak highly of the quality and our service. After that they purchase the shipbuilding steel plate from us regularly. In May,2018, the Myanmar navy’s local representative visit our office and production line, and sign another contract 2025 ton steel order in our office.
}The main contents of safety inspection for atmospheric storage tank, API Std 650 anchored liquid-storage tanks are to see whether the tank foundation is sunk, whether the tank is corroded, whether there are cracks in the tank body and bottom, whether there is concave convex phenomenon on the top and wall of the tank, whether the accessories of the storage tank are in good condition, etc. After the API Std 650 anchored liquid-storage tanks safety inspection and detection, the defects found in the tank should be handled according to the inspection rules in time to ensure the normal and safe use of the storage tank in the later stage.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.