6061 aluminum bar API Std 650 open-top tanks

The preparatory work before the construction of the API Std 650 open-top tanks is directly related to the quality assurance, project progress, construction safety and other aspects of the entire oil tank project. Therefore, the preparation work before the API Std 650 open-top tanks construction should be paid attention to and planned. Before API Std 650 open-top tanks construction, you need to prepare conventional machinery, materials, and facilities, as well as the quality control of the project, such as the installation method of the API Std 650 open-top tanks, the welding method of the steel plate, and the inspection of the tank material. In addition, there is the most important item, construction safety protection.Bearing on Foundations
Foundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API Std 650 open-top tanks water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).The API Std 650 standard published by the American Petroleum Institute (API) is designed to provide the petroleum industry with welded steel tanks for use in the API Std 650 open-top tanks storage of petroleum products and other liquid products commonly handled and stored by the various branches of the petroleum industry.Based on the principle of “sincerity and win-win cooperation”, our company keeps forging ahead. In the fierce market competition, we have won the trust and rapid development of our customers with good cooperation and sincere service spirit. With pioneering spirit, the pursuit of excellence, continuous learning, and never satisfied content, we will create a win-win situation with our customers to create a better future. The company has sufficient inventory and complete varieties and specifications.The boiler steel plates are among our main products. Other than standard size boiler steel plates, we also provide API Std 650 open-top tanks cutting, bending and so on processing to change plate size and shape according to your requirements. Welcome to consult us about API Std 650 open-top tanks ASTM A204 grade B properties, SA 516 gr 70 temperature range, ASTM A285 grade C chemical composition, boiler steel price and so on questions and ask for offer.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!