5454 aluminum pipe API standard 650 anchored tanks
The internal floating plate of internal floating roof tank of API 650 tank is different from that of open floating plate of API standard 650 anchored tanks External floating roof tank of API 650 tank, so it is impossible to have rain and snow load.
Requirements for prefabrication of the top of large vertical API standard 650 anchored tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.
Heat-affected zone impact specimens shall be taken across the weld and as near the surface of the material as is practicable. The API standard 650 anchored tanks material specimens shall be of sufficient length to locate the notch in the heat-affected zone after etching. The notch shall be cut approximately normal to the material surface to include as much heat-affected zone material as possible in the resulting fracture. Impact test specimens shall be cooled to the temperature stated in Q.22.
Our quality control department will do inspection for details of the steel materials API standard 650 anchored tanks before delivery. We would invite the customer side to attend the inspection together. If they can not come, we will also take rich pictures for them to check. Meanwhile, we will publish inspection report and send them the PDF version. Besides, we accept any third party inspection such as SGS, BV, etc. And our quality control department will support the third party to inspect the steel materials smoothly and try our best to deliver the qualified steel materials to customers earlier.
BBN company has implemented a resource strategy combining global resource procurement, domestic resource unified purchase, and joint purchase and distribution. It has maintained good relations of cooperation with more than 100 domestic and foreign steel mills, and can purchase low-quality and high-quality steel futures in all directions and through multiple channels. The company can grasp the specifications and quantities of the spot resources of major steel mills in real time, and can timely and quickly meet customer demand for steel spot resources.