42m diameter API 650 cylindrical tanks
The insert plate weld shall not cross any shell seams and shall be at least the greater of 10 times the shell thickness or 12 in. from any other weld in the API 650 cylindrical tanks shell including shell seams, shell-to-bottom weld or attachment welds. The butt weld around the periphery of the plate shall be examined over 100% of its length by both liquid penetrant method and radiographic method. The liquid penetrant examination is required on the root pass, on the back-gouged surface, and on the inside and outside finished weld surfaces. Additionally, the weld shall be vacuum box leak tested.
Pipeline transportation of API 650 oil tank is not less than the maximum consumption of 3 to 5 days. The daily operating time of API 650 cylindrical tanks office buildings and fuel oil equipment is 12-16 hours; for high-end residential hotel buildings, the daily operating time is 16-24 hours.
The finned tube heating device for high temperature heat transfer oil for large API 650 cylindrical tanks has the advantages of convenient inspection and maintenance. The high-efficiency fin heating coil assembly is composed of spirally arranged finned coils. The fins are mainly arranged in the straight pipe section, and the whole assembly is supported by several angle steel supports. The high-efficiency fin heating coil component can enter and exit from the manhole of the API 650 cylindrical tanks, which is convenient for maintenance and repair.