1100 aluminum plate API Std 650 aluminum tanks
Define the welding sequence of API Std 650 aluminum tanks bottom plate: the welding sequence of metal vertical storage tank shall be carried out according to the procedure required by the welding scheme. Spot welding shall be consistent with the formal welding requirements, and no spot welding shall be carried out for the weld not welded. Back bar should be added to prevent deformation when welding the full length seam of middle plate, butt joint of edge plate and turtle shell joint.
Temporary Openings after Hydrostatic TestWhen approved by the Purchaser in writing, and only in the case of tanks which when complete have no shell penetrations, it is permitted to restore by welding up to four temporary shell openings after the hydrostatic test in accordance with the provisions of this section. Each temporary opening shall be restored by the insertion of a shell plate that matches the thickness and specification of adjacent shell material, and is welded into place with full fusion butt-welds. The API Std 650 aluminum tanks insert plate shall be round with diameter no less than 24 in. and no greater than 42 in.
API 650 external floating roof storage tanks are generally called external floating roof API Std 650 aluminum tanks tanks, which means that the storage tanks are externally open tanks without a dome design, and are equipped with vertical floating roofs. API 650 external floating roof storage tanks are usually used for large More than 20,000 cubic meters of open steel API Std 650 aluminum tanks storage tanks for storing volatile petroleum products such as crude oil, gasoline, kerosene, etc.