10.5m diameter API Std 650 SUG I tanks
API 650 petroleum storage tank stipulates that if the thickness of the lower siding obtained by calculating the anti-overturning moment is greater than the thickness of the API Std 650 SUG I tanks hydrostatic pressure test (both do not include the corrosion margin), the calculated thickness of the above siding required by the hydrostatic pressure is It should also be increased by the same proportion, unless special analysis is performed to determine the seismic overturning moment and corresponding stress at the bottom of each layer of API 650 petroleum storage tank wall.
Oil storage tank is an important equipment commonly used in petroleum and petrochemical industry. New API Std 650 SUG I tanks, metal storage tank must be tested before it can be put into use or put into storage. The common inspection methods of API Std 650 SUG I tanks include radiographic testing, ultrasonic testing, magnetic particle testing and dye penetrant testing. The parts and operation requirements of these testing methods are different, so they should be selected according to the required characteristics.
Steel Storage Tanks Cover Plates MaterialASTM A516 Gr 55 Carbon Steel Pressure Vessel Plates for API Std 650 SUG I tanksASTM A285, Pressure Vessel Plates for Low- and Intermediate-Tensile StrengthASTM A307 Carbon Steel Bolts and StudsASTM A320 Alloy Steel Bolting Materials for Low-Temperature ServiceASTM A333 Seamless and Welded Steel Pipe for Low-Temperature ServiceASTM A334 Seamless and Welded Carbon and Alloy-Steel Tubes for Low-Temperature ServiceASTM A350 Forgings, Carbon and Low-Alloy Steel for Piping ComponentsASTM A351 Castings for Pressure-Containing PartsASTM A353 Pressure Vessel Plates, Alloy Steel
Our quality control department will do inspection for details of the steel materials API Std 650 SUG I tanks before delivery. We would invite the customer side to attend the inspection together. If they can not come, we will also take rich pictures for them to check. Meanwhile, we will publish inspection report and send them the PDF version. Besides, we accept any third party inspection such as SGS, BV, etc. And our quality control department will support the third party to inspect the steel materials smoothly and try our best to deliver the qualified steel materials to customers earlier.
Tianjin warehouse mainly stores steel plates and steel pipes. The monthly replenishment is about 12000 tons. Our inventory cycle is short and flexible. Shanghai warehouse mainly stores API Std 650 SUG I tanks ,steel plate and section steel. The average monthly purchase volume is about 15000 tons. The geographical location of the warehouse has greatly improved our performance in terms of transportation and delivery time.