The net working capacity of API 650 aboveground petroleum storage tanks
API 650 internal floating roof API 650 aboveground petroleum storage tanks tank can be used to store gasoline, jet fuel and other volatile oil products, as well as aldehydes, alcohols (methanol, ethanol), ketones (acetone), benzene (benzene, toluene, xylene, styrene) and other liquid chemicals.
Design of Reinforcement for Single Openings in Tank WallsThe 20 in. x 29 in. obround manhole shown in Figure F-5 is located in solid plate in the sidewall of a cylindrical storage tank 45 ft in diameter in an area where the thickness of the wall plate, tw, is 1/2 in. No corrosion allowance is required. The total internal pressure, Pl + Pg, at the horizontal centerline of the opening is 27.5 lbf/in.2 gauge. The thickness of the wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.485 in. The manhole neck is fabricated by welding from 3/8 in. plate. The materials in the API 620 tank wall, the manhole neck, and the reinforcing pad conform to ASTM A516 Grade 60. The joints in the welded steel storage oil tank wall and the longitudinal joint or joints in the manhole neck are double-welded butt joints, spot radiographed in accordance with 7.16 and 7.17.
The structure of the API 650 aboveground petroleum storage tanks foundation mainly includes the insulating anticorrosion layer on the top surface of the foundation, the tank wall support, the edge retaining structure, the sand cushion, the oil and water barrier, the detection signal tube and other structures. The construction materials and requirements of each basic structure of the storage tank are different. After the structure of the API 650 aboveground petroleum storage tanks foundation is built in accordance with the construction requirements, the settlement of the storage tank foundation needs to be observed, and the uneven settlement value of the storage tank foundation should be within the allowable safety range.
Enterprise Motto:Integrity, harmony, dedication, innovation and developmentAbility is the cornerstone of success; action is the ladder of successGrow with the enterprise; progress with the enterpriseGive a platform to those who actually do things and a stage to those who successfully do thingsDare to be the first, to pursue excellence.
We have efficient and quick logistic team service. We promise that after the customer places the order, the spot products will be shipped, processed, and cut on the same day. The steel API 650 aboveground petroleum storage tanks products will be shipped in 2-5 days according to the characteristics of the product. The company has always been adhering to the service concept of "integrity, pragmatism, enthusiasm" and dedicated to providing our customers with high-quality steel products and after-sales service.
Compared with other fast-moving consumer goods, steel consumption is obviously different, with a wide range of use and a long service life. Therefore, the quality and service of steel materials are particularly important. Service is always one of our top concerns, especially after-sales service. We have mature after-sales service team, and can help you solve problems professionally during application of the steel materials.