Piping systems connected to API standard 650 open-top tanks
Floating roof is the key component of floating roof API 650 storage tank, which can be divided into external floating roof and internal API standard 650 open-top tanks floating roof. The internal floating roof has a fixed top cover above the floating roof, which can prevent the floating roof from being exposed to wind and rain, and ensure the quality of oil stored under API 650 storage tank.
In order to prevent the deformation of the bottom of metal vertical API standard 650 open-top tanks during welding, comprehensive control measures such as strict control of assembly geometry size, reasonable welding procedure, process control of welding deformation and rigid fixation are adopted during assembly welding. The specific methods are as follows:1. Strictly control welding groove forming of API standard 650 open-top tanks.2. Strictly control the size of tank welding seam assembly.3. Define the welding sequence of tank bottom plate.4. Reasonable distribution of welders.
In this project, an elemental area of tank wall used is constructed of ASTM A442 Grade 55 steel plate subjected to a meridional unit force, T1, of 4000 lbf/in.2 tension and a latitudinal unit force, T2, of 5060 lbf/in.2 compression. The meridional radius of curvature, R1, is 75 in., and the length of the normal from the surface to the axis of revolution, R2, is 300 in. The joints in the wall are of double-welded butt-joint construction with a tensile efficiency of 85%. A corrosion allowance of 1/16 in. is required.The problem in this example is to graphically find the minimum thickness of tank wall required for the given conditions (see 5.10.3.3).Solution: As determined from Table 5-1, the maximum allowable tensile stress value, Sts, for ASTM A442 Grade 55 steel plate in simple tension is 16,500 lbf/in.2. Since the compressive stress is latitudinal, the governing value of R in this situation is R1, or 75 in.
Customer service center has provided after-sales service for many large-scale information systems, and has accumulated rich working experience in the process of API standard 650 open-top tanks service for many years. It can provide accurate, timely and high-quality support and service for users, which is well received by users.
The company's headquarters has a well-established logistics distribution system, which can quickly transport the steel materials to the port through the contracted logistics companies. Professional contracted logistics companies can significantly reduce costs and various commodity-related expenses. Meanwhile, the flexible transfer ensures that the API standard 650 open-top tanks steel materials can be shipped immediately after passing the quality inspection.