ISO 630 plates API 650 special tank
API 650 petroleum storage tank stipulates that if the thickness of the lower siding obtained by calculating the anti-overturning moment is greater than the thickness of the API 650 special tank hydrostatic pressure test (both do not include the corrosion margin), the calculated thickness of the above siding required by the hydrostatic pressure is It should also be increased by the same proportion, unless special analysis is performed to determine the seismic overturning moment and corresponding stress at the bottom of each layer of API 650 petroleum storage tank wall.
API 650 special tank, Vertical oil storage tank is an important equipment for many enterprises to carry out production, which provides important support and help for the storage of many reagents. Vertical storage tank is generally used as atmospheric pressure vessel. Advantages: the filling rate of cylindrical structure is second to that of spherical tank, and the largest volume of the storage tank can be made into tens of thousands of cubic meters. The structure is simple and the construction requirements are relatively low.
The API 650 special tank stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
BBN company team and culture: tt the end of 2019, in order to thank employees for their hard work and enrich their sparetime lives, the company organized a pleasant trip to Phuket Island, Thailand. This tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5o'clock in the afternoon on the 22th December. Let's seize the day and live it to the full, and greet the arrival of the year 2020 together.
As a leading international steel supplier, we have two warehouses, close to Tianjin port and Shanghai port. This superior geographical location effectively saves the domestic transportation cost and greatly improves our service level. At the same time, it also shortens our delivery time and provides more convenience for customers.