Inspection requirements for API Std 650 storage tanks
The company has been engaged in the design, construction and installation of foreign API 650 standard API Std 650 storage tanks storage tanks for a long time. It has the international qualification of ASME welding technology, has the design ability of API 650 oil tanks and API 650 storage tanks, and has pressure vessel design and manufacturing license and GC pressure pipeline installation license. Certificate, API Std 650 storage tanks petrochemical equipment pipeline general contracting qualification, safety production license, international trade import and export license.
When roof plates, knuckle plates, compression rings, and manways and nozzles including reinforcement are primarily subjected to atmospheric temperature, the rules in API 620 oil tank standard Q.2.3 shall govern.Large Welded Storage Tanks Secondary ComponentsIn general, secondary components include those components that will not be stressed to a significant level by the refrigerated liquid, those whose failure will not result in leakage of the liquid being stored, those exposed to product vapors, and those that have a design metal temperature of –60°F or higher.
Inspection of API Std 650 storage tanks bottom: magnetic flux leakage scanning technology is used to detect the corrosion condition of API Std 650 storage tanks bottom plate (such as corrosion depth and area, crack length, etc.). When there is a defect in the bottom plate of the API Std 650 storage tanks, the magnetic field distribution will change and the sensor can detect it. The bottom of the oil tank should be free of foreign matters and dry during testing. Weld inspection of API Std 650 storage tanks bottom plate: when vacuum leak test method is used to detect the tightness of oil tank bottom plate, soap water shall be applied to the weld and vacuum box shall be covered for observation.
We had a wonderful trip in Phuket Island, Thailand. At the end of 2019, in order to thank employees for their hard work for a year and enrich their lives, our company organized a pleasant trip to Phuket Island, Thailand. The tour lasted 6 days and 5 nights, and returned by plane on the evening of December 27. We took off in Zhengzhou at about 5 o'clock in the afternoon on the 22th December.
Ningbo port has trade and transportation with more than 50 countries and regions, such as the United States, CIS countries, Europe, Africa, Japan and South Korea, Southeast Asia, the Middle East and Hong Kong. Ningbo port has initially formed an all-round three-dimensional collection and distribution network of expressways, railways, aviation, river sea intermodal transport, water to water transfer, etc.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.