API Std 650 welded aluminum storage tanks foundations for leak detection
Determination of Required CapacityThe aggregate capacities required for any vent valves, pressure-relieving valves, and/or vacuum-relieving valves to be provided should be determined as follows:a)For thermal breathing and product movement, the rules given in API 2000 shall be followed. The required capacity as the result of the product movement into the tank API Std 650 welded aluminum storage tanks given in API 2000, shall be multiplied by the ratio of the absolute tank pressure to atmospheric pressure (14.7 lbf/in.2 absolute).b)For supplemental safety pressure-relieving devices to take care of extra venting capacity required in case of external fire exposure, the rules in API 2000 shall be followed.
The liquid level of API 650 oil storage tank is covered by floating roof. The storage liquid of API 650 oil storage API Std 650 welded aluminum storage tanks tank is isolated from the air, reducing air pollution, fire and explosion hazards, and easy to ensure the quality of liquid storage. It is especially suitable for the API Std 650 welded aluminum storage tanks storage of high-grade gasoline, jet fuel and toxic and easily polluted liquid chemicals.
In the year of 2015, customer from Peru oil refinery contact with us from Internet. After one month’s negotiation and quotation, they chose us as there supplier of raw steel plate API Std 650 welded aluminum storage tanks grade ASTM A36. We get an trail order of 300 tons in April. When the first ship arrived, they inspect the steel plate and very happy with the quality we supply. Then they put another 1700 tons order, we sent to them within 90 days. Our company management group visit the customer in the beginning of 2016 and the visit is very successful.
}Prefabrication requirements of API Std 650 welded aluminum storage tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.
Over the years, the company has strived for perfection, being well-received. By virtue of stable product performance, high-quality engineering effects and perfect service system, we have won the trust of many customers, and our engineering cases and after-sales service systems are spread all over the world. We regularly conduct quality tracking and return visits by phone and email, listen to customers' opinions, and continuously improve service quality.