API Std 650 vertical welded storage tanks lining
Upon completion of construction, provide Purchaser with copies of Field Erected API Std 650 vertical welded storage tanks Storage Tank Datasheets in accordance with Appendix L of API 650, which reflects the as-built conditions, certifying that the tank conforms with the requirements of this specification.
Data Required from Manufacturer on Completed TanksIf specified in the purchase order, the Manufacturer shall supply marked copies of plans (or a separate sketch) showing the location of all plates, with a means of identifying each plate with the heat numbers. These markings shall be checked by the inspector. A copy shall be attached to the Manufacturer’s report.Check of Stress-relieving OperationThe API Std 650 vertical welded storage tanks inspector shall check any thermal stress-relieving operation and shall be satisfied that the temperature readings are accurate and that the procedure conforms to the applicable requirements of these rules.
The lip seal of floating roof storage tank, API Std 650 vertical welded storage tanks relies on the sliding contact between elastic lip and tank wall. This kind of seal has strong applicability, but the requirements of manufacturing technology and material selection are high, and the determination of elastic seal also exists. The secondary seal of floating roof storage tank, API Std 650 vertical welded storage tanks is to add a seal on the basis of primary seal. It is proved by experiments that the secondary seal can reduce the liquid consumption by more than 50%, and has a more significant effect in safety.
The 2019 Year of the Pig is the 70th anniversary of the founding of the People's Republic of China. Growing up with the motherland, our company sang songs to the mark the 70th victory anniversary. In September, we organized all employees to sing "My Country and I" and made a film.
Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.
There is a careful, patient, enthusiastic and thoughtful after-sales team, a professional distribution, ultra-efficient warehouse and logistics center, a marketing team with marketing expertise, an innovative technology center with strong steel technology, an experienced manufacturing center with rigorous professionalism Quality Inspection Center, an operation team with many years of administrative management experience. Such a strong combination of teams makes BEBON a steel giant in Henan Province.