API Std 650 uplifting tanks automatic welding
Every after-sales service shall have a detailed record of the customer's product problems and handling methods. The records shall be sorted into volumes and filed on a monthly basis, and submitted to the technical department for filing. The problems found in the after-sales service shall be summarized in a timely manner, discussed with the technical department, the quality inspection department and the production department, and a proper solution shall be proposed for the technical department to improve in a timely manner;
Welding inspection of bottom plate of API Std 650 uplifting tanks, vertical oil tank: During the fabrication and installation of API Std 650 uplifting tanks, the bottom edge plate is welded first. According to the requirements of the technical standard, penetrant inspection is required for the weld of edge plate at the bottom of API Std 650 uplifting tanks, that is, penetrant testing is required for each weld bead priming, filling and capping. In the process of testing, if any defect is found, it shall be repaired immediately. After the repair, the surface coloring penetrant test shall be conducted again until the test result is qualified.
Combination of Design LoadsThe inner tank API Std 650 uplifting tanks shall be designed for the most critical combinations of loading that result from internal pressure and liquid head, the static insulation pressure, the insulation pressure as the inner tank expands after an in-service period, and the purging or operating pressure of the space between the inner and outer tank shells, unless the pressure is equalized on both sides of the inner tank.