API standard 650 cylindrical liquid-storage tank earth foundations without a ringwall
Under the same sealing effect, the internal floating roof tank of API 650 oil storage tank can further reduce the evaporation loss compared with the API standard 650 cylindrical liquid-storage tank External floating roof tank. This is due to the shielding of the fixed roof and the gas layer between the fixed roof and the internal floating plate, which has more significant heat insulation effect than the double disc floating roof of the API standard 650 cylindrical liquid-storage tank external floating roof tank.
The coating on the outer wall of API standard 650 cylindrical liquid-storage tank can not only reflect light but also prevent corrosion. Different coatings for oil tanks have different reflective properties, and the reflective performance of coatings is expressed by reflection index. For example, the reflection index of white coating is 90.0, that of sky blue coating is 85.0, and that of light gray coating is 57.0. It can be seen that the white coating has good reflective performance, and coating the outer surface of API standard 650 cylindrical liquid-storage tank with white coating can reduce the evaporation consumption of the oil tank.
When roof plates, knuckle plates, compression rings, and manways and nozzles including reinforcement are primarily subjected to atmospheric temperature, the rules in API 620 oil tank standard Q.2.3 shall govern.Large Welded Storage Tanks Secondary ComponentsIn general, secondary components include those components that will not be stressed to a significant level by the refrigerated liquid, those whose failure will not result in leakage of the liquid being stored, those exposed to product vapors, and those that have a design metal temperature of –60°F or higher.
Our quality control department will do inspection for details of the steel materials API standard 650 cylindrical liquid-storage tank before delivery. We would invite the customer side to attend the inspection together. If they can not come, we will also take rich pictures for them to check. Meanwhile, we will publish inspection report and send them the PDF version. Besides, we accept any third party inspection such as SGS, BV, etc. And our quality control department will support the third party to inspect the steel materials smoothly and try our best to deliver the qualified steel materials to customers earlier.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).