API standard 650 aluminum tanks qualification of welding procedures

In this project, an area of steel storage oil tank wall is constructed of ASTM A285, Grade C, steel plate that is 5/8-in. thick and has spot-radiographed, double-welded butt joints. The wall is subject to tension in a meridional direction and to compression in a latitudinal direction. The values of R1 and R2 at the point under consideration are 75 in. and 300 in. respectively. A corrosion allowance of 1/16 in. is required. The computed (meridional) tensile stress, stc, in the net thickness after deduction of the corrosion allowance is 6000 lbf/in.2.

Pipeline transportation of API 650 oil tank is not less than the maximum consumption of 3 to 5 days. The daily operating time of API standard 650 aluminum tanks office buildings and fuel oil equipment is 12-16 hours; for high-end residential hotel buildings, the daily operating time is 16-24 hours.

In 2013, one of our clients in Korea purchased 890 tons Q345B square tube from us for one building construction project. Our clients required no burr in the side of the tube, we finally produce the goods with great condition and +/-0.25mm tolerance for wall thickness, which is a very great tolerance with customers’ required size. Our square tube full available range is 2-16mm for wall thickness, and 40-500mm for width. In addition, our Q/C department will seriously control all of the process of every order.

}

storage tank is used to store all kinds of liquid, solid and gas materials. The common types of storage tank are oil tank, water storage tank, chemical tank, cement tank, API standard 650 aluminum tanks, etc. When choosing the storage tank, users should choose according to their actual needs, such as the material, pressure, form, capacity, temperature, density, etc. In addition, the environmental factors such as the temperature of the tank construction area, the ground endurance of the foundation, and the wind force should be considered.

We should focus on the main problems to be solved and pay attention to efficiency. After receiving the user's quality objection report data, the possible causes, responsible units, compensation amount, etc. of the problem shall be judged based on experience. To have a clear service plan, to be clear about what your main problem is, what technical support is needed, these should be prepared.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!