API 650 welded storage tanks self-anchored
The effect of air pressure on the API 650 welded storage tanks tank walls of the API 650 tank must be considered when the design pressure is greater than 2 kPa.The fixed point method can be used to design the tank wall of atmospheric or micro internal pressure API 650 welded storage tanks storage tank.
According to the standard of head of API 650 welded storage tanks, there should be no crack, delamination, inclusion and other defects on the groove surface, which is consistent with the steel plate standard. The API 650 welded storage tanks head polishing can adopt different technology according to different requirements, including rough polishing, medium polishing and fine polishing. Only the materials used for the third type of pressure vessels must be retested, and the materials used for the first and second class pressure vessels are not generally re inspected.
Hydrostatic TestThe API 650 welded storage tanks product shall be vented to the atmosphere when it is filled with or emptied of water. During water filling, the elevations of at least four equidistant points at the bottom of the tank shell and on top of the ringwall or slab shall be checked. Differential settlement, or uniform settlement of substantial magnitude, requires an immediate stop to water filling. Any further filling with water will depend on an evaluation of the measured settlement.
We have Business Department, Transportation Department, Document Department, Shipping Department, E-C department, Procurement Department, Finance Department, Human Resources Department, Administration Department, Logistics Department, After-sales so on Departments. Each department performs its own duties, unites and cooperates, and contributes its greatest strength to the overall operation of the company. So as to ensure the stable and sustainable development of the company.
"Efficiency is benefit, time is money", the company is equipped with a high standard logistics team. After the products pass the factory inspection, they will coordinate the shipment as soon as possible according to customer requirements and schedules to hand over the booked steel materials to customers at the first time, to ensure no delay of customer's project progress, to strive for more project preparation time for customers.